beautypg.com

Multi channel systems, W8-headstage – Multichannel Systems Wireless Headstages User Manual

Page 5

background image

Multi Channel Systems
MCS GmbH
Aspenhaustrasse 21
72770 Reutlingen
Germany

Fon +49-7121-9 09 25- 0
Fax +49-7121-9 09 25-11

[email protected]
www.multichannelsystems.com

© 2014 Multi Channel Systems MCS GmbH

Product information is subject to change
without notice.

W8-Headstage

Pin Layout of the 8-Channel Headstage for the Wireless Recording System

multi

channel

systems

*

Pin Layout of the single row precession socket (1.27 mm, round pin).
Please orientate the headstage as shown on the diagram.

GND

Ground

REF

Reference

E1

Electrode

1

Channel

1

E2

Electrode

2

Channel

2

E3

Electrode

3

Channel

3

E4

Electrode

4

Channel

4

E5

Electrode

5

Channel

5

E6

Electrode

6

Channel

6

E7

Electrode

7

Channel

7

E8

Electrode

8

Channel

8

W8-Headstage top side:
The white connector is for the storage battery.
Please use this connector for the orientation
of the headstage.

W8-Headstage bottom side:
Connector for the electrode probe
or the ME/W-Signal generator.

W8-Headstage with single row socket
Diagram of the bottom side with pin layout.

Connector for W8-Headstage
with single row socket

The connector mates with a standard
single row 1.27 mm pin connector such as:

preci-dip

850-10-010-10-001101

MC_Rack

Storage battery connector
on the opposite side
for orientation.

GND REF E1 E2 E3 E4 E5 E6 E7 E8

Please orientate the headstage
as shown on the diagram.