beautypg.com

Installation, Hrc fuse recommended – Mody Pumps NC 06360_08360_10360-M User Manual

Page 4

background image



F] CABLE GLAND ASSEMBLY
: THE PUMP IS SUPPLIED WITH 50 FEET CABLE AS STANDARD.

THE CABLE IS A 4 CORE EPR SHEATHED AND INSULATED CONFORMING TO INT'L STD. THE

CABLE IS WATERPROOF AND CAN BE COMPLETELY SUBMERGED IN WATER. THE CABLE IS

TERMINATED IN THE PUMP AT THE CABLE GLAND. THE GLAND ASSEMBLY SEALS THE CABLE

ON THE OUTSIDE SHEATH. A WATER DAM ARRANGEMENT IS ALSO PROVIDED WHICH SEALS THE

INDIVIDUAL CORES OF THE CABLE. THIS FEATURE IS UNIQUE AND IS ESSENTIAL TO

PREVENT WATER SEEPING THROUGH THE CORES OF THE CABLE INTO THE TERMINAL CHAMBER

IN THE EVENT OF A CUT CABLE. THE CABLE IS ALSO SHEATHED FOR THE FIRST ONE METER

BY MEANS OF A CABLE GRIP MADE OF STAINLESS STEEL. THIS IS ESSENTIAL TO ENSURE

THAT THERE IS NO UNDUE STRAIN ON THE CABLE IF THE PUMP IS PULLED OR LOWERED

INADVERTENTLY BY MEANS OF THE CABLE. COMPLETE DETAILS OF THE CABLE GLAND

ASSEMBLY ARE SHOWN IN THE DRAWING.


G] ELECTRICAL INFORMATION: MOTORS ARE TYPICALLY DESIGNED TO OPERATE ON

230/460V AT 60 HZ. EXPORT DESTINED PUMPS ARE PREWIRED FOR SINGLE VOLTAGE AND

FREQUENCY. MAXIMUM DEVIATION IN VOLTAGE ALLOWED IS -/+ 6% AND FREQUENCY -/+ 3%.

CHECK NAME PLATE FOR OPERATING VOLTAGE AND FREQUENCY.

INSTALLATION

.

• CHECK THAT THE SITE VOLTAGE CORRESPONDS WITH THAT OF THE PUMP.

• CHECK THAT FUSES ARE INTACT.

• USE SHORTEST POSSIBLE HOSE IN RECOMMENDED DIMENSION. AVOID SHARP BENDS,

CREASES, AND CONTRACTIONS.

THE MAXIMUM SUBMERGENCE RECOMMENDED IS 50 FEET.
THE SPECIFIC GRAVITY OF THE PUMPED FLUID SHOULD NOT EXCEED 1.1.
• NEVER LIFT OR PULL THE PUMP BY MEANS OF THE CABLE. SUSPEND THE PUMP BY A

ROPE OR PREFERABLY PLACE IT ON A SOLID BASE.

• WIRE THE PUMP TO THE MAINS CORRECTLY. ALWAYS USE A STARTER OR A PANEL BOARD.

SEE INSTRUCTIONS UNDER "MOTOR PROTECTION" BELOW.

• AT THE STARTING MOMENT, THE PUMP SHALL MAKE A KICK, WHICH IS OPPOSITE TO THE

DIRECTION OF ROTATION OF THE IMPELLER. SHIFT TWO PHASES IN THE POWER

CONNECTION IF THE KICK IS IN THE WRONG DIRECTION. THE CORRECT DIRECTION IS

INDICATED ON THE PUMP COVER AT THE TOP OF THE PUMP.

• CHECK LEVEL AND CONDITION OF THE OIL AT SERVICE EVERY SIX MONTHS. IF THE OIL

IS EMULSIFIED BY WATER THE SEALS MUST BE REPLACED.

• THE SHAFT SEAL SHOULD BE CHECKED FOR WEAR EVERY 2500 HRS. OF OPERATION. IF

SEAL FACES SHOW ANY SIGNS OF WEAR, THEY SHOULD BE REPLACED. REFER TO PAGE 5

FOR SERVICING THE PUMP SEALS.



HRC FUSE RECOMMENDED

MAINS VOLTAGE AT SITE NC06 M NC08 M NC10 M

220 VOLTS 3 PHASE 25 AMPS 30 AMPS 40 AMPS
380 VOLTS 3 PHASE 16 AMPS 20 AMPS 25 AMPS
415 VOLTS 3 PHASE 16 AMPS 16 AMPS 25 AMPS
460 VOLTS 3 PHASE 16 AMPS 16 AMPS 25 AMPS