Quick guide – Custom Electronics AOV Multi Zone User Manual
Page 16

Quick guide
• Fix unit on to wall using mounting holes provided.
• Remove cable ties securing zone cards.
• Connect mains via lower power supply and switch on.
• Check all power supplies are active.
• Check all AOV boards have power.(Timers will enable upon initial
turn on).
• Install batteries to relevant power supplies – removes fault
indications on front panel.
• Install call points, smoke testers or relays to terminals J8-J12 (fire
all zones - Link).
• Install call points, smoke testers or relays to terminals
J33,J39,J42,J48,J53 (Fire zones individually - Link)
• Install actuators to ‘Load’ terminals.