beautypg.com

Hydrotech DLR-AP Ultraviolet Water Disinfection Unit User Manual

Page 5

background image

5

Select a location that meets the following guidelines.
• The unit must be installed between the cold water source and the water heater as

inlet temperature must not exceed 100

o

F. (See Figure 1 for proper installation

sequence.)

• The disinfection unit can be installed either horizontally or vertically. (See Figure

3 for water flow direction.)

• There must be enough clearance to remove the UV lamp and the quartz sleeve for

replacement and regular maintenance. Recommended clearance is length of unit
plus four inches. (See Figure 4 for additional clearance requirements.)

• The unit must be within 7 feet of an 110V electrical outlet. A 7'5" cord is included

with the unit.

• The unit must be protected from freezing. Freezing damage will void the warranty.

• The unit should be placed where a potential leak will not cause water damage.

WEDECO is not responsible for water damage.

5

This manual is related to the following products: