Job specification sheet – Hydrotech 6700 XTR Valve Downflow Automatic Water Softeners Service Manual User Manual
Page 3
Page 3
Job Specification Sheet
NOTE: Some options may not be available depending on valve model or other options chosen.
Circle and/or Fill in the Appropriate Data for Future Reference.
System Type:
Meter Immediate / Time Clock Delayed / Volume Override Delayed.
Volume Override Immediate / Meter Delayed Weekly Reserve.
Meter Delayed Variable Reserve / Meter Delayed Fixed Reserve..
.
.
.
Valve Type:.. .
.
.
.
56XT/6700
Proprietary C
Regenerant Flow:
Down Flow / Up Flow / Downflow Double Backwash / Up Flow Back Wash.
Filter / Up Flow Variable Flow
Display Format:
U.S. or Metric (French Degrees, German Degrees, or PPM)
Unit Capacity:
_____________ Grains/French Degrees/German Degrees/PPM
Water Hardness:
_____________ Grains/French Degrees/German Degrees/PPM
Capacity Safety Factor:
Zero or ______ %
Volume Override:
_________ (Gallons or M
3
)
Regeneration Day Override: Off or Every ______ Days
Regeneration Time:
Delayed _________ AM/PM or ______Immediate
Regeneration Cycle Step #1:. _._.:._._.:._._.
Regeneration Cycle Step #2:. _._.:._._.:._._..
Regeneration Cycle Step #3:..._._.:._._.:._._..
Regeneration Cycle Step #4:. _._.:._._.:._._..
Regeneration Cycle Step #5:. _._.:._._.:._._.
Media Volume:
_________ (CuFt or Liter)
Salt Dosage:
_________ (lbs/CuFt or grams/Liter)
BLFC Size:
_________ gpm
Auxiliary Relay:
Enabled or Disabled
Auxiliary Relay Start 1:.
.
_.:._._.:._._.
Auxiliary Relay End 1:..
.
_.:._._.:._._.
Auxiliary Relay Start 2:.
.
_.:._._.:._._.
Auxiliary Relay End 2:..
.
_.:._._.:._._
Chemical Pump:
Enabled or Disabled
CPO Aux Relay Volume:
_________ (Gallons or M
3
)
CPO Aux Relay:
_._.:._._.:._._
Flow Meter Size:
.75” Paddle
.75” Turbine
Generic Flow Meter:
Maximum Flow Rate: Add _ _ Gallons every _ _ Pulses