beautypg.com

Dlfu/dlfmu/dlkfu/dlkfmu, Ebara submersible sewage pumps, Operating, installation, and maintenance – EBARA DLKFMU User Manual

Page 5: Installation 3. electrical wiring, Warning

background image

Ebara Submersible Sewage Pumps

DLFU/DLFMU/DLKFU/DLKFMU

Operating, Installation, and Maintenance

Ebara

Fluid Handling

www.pumpsebara.com

5

(803) 327-5005 • (803) 327-5097

fax

rev. 04/14

Installation
3. Electrical Wiring:

(1) Wiring

a) Wire as indicated for the appropriate start system as shown in Fig. 3.
b) Loose connections will stop the pump. Make sure all electrical connections are secure.

output 2 to 5HP
208/230V

460V

warning

Check that the power is locked off and disconnected before working on pump. all electrical work should be
performed by a qualified electrician and all national and local electrical codes must be observed.

G – GRN
L

1

– RED – T

1

– T

7

L

2

– WHT – T

2

– T

8

L

3

– BLK – T

3

– T

9

T

4

– T

5

– T

6

– T

10

– T

11

– T

12

P

1

– RED

P

2

– WHT

P

3

– BLK

P

4

– OR

G – GRN

G – GRN
L

1

– RED – T

1

L

2

– WHT – T

2

L

3

– BLK – T

3

T

4

– T

7

T

5

– T

8

T

6

– T

9

T

10

– T

11

– T

12

P

1

– RED

P

2

– WHT

P

3

– BLK

P

4

– ORG

G – GRN

This manual is related to the following products: