Installation – EBARA CLU User Manual
Page 6

EBARA Submersible Sewage Pumps
DLU / DLMU
Operating, Installation, and Maintenance
EBARA
Fluid Handling
www.pumpsebara.com
6
(t) 803 327-5005 • (f) 803 327-5097
rev. 01/10
Installation
3. Electrical Wiring:
(1) Wiring
a) Wire as indicated for the appropriate start system as shown in Fig. 3.
b) Loose connections will stop the pump. Make sure all electrical connections are secure.
WARNING
Check that the power is locked off and disconnected before working on pump. All electrical work should be
performed by a qualified electrician and all national and local electrical codes must be observed.
Manual Operation Type – Single Phase
Output 1 to 5HP
U : RED
V : WHITE
Y : BLACK
G : GREEN
❖ Output 1 to 2 HP Model : 3ARR3 FJ10EE3 6×551 (Mfr : GE)
Pick-up : 185-200V
Drop-out : 105-40V
Capacity : 35A
❖ Output 3 to 5HP
Model : 3ARR3 FJ4EK2 6×555 (Mfr : GE)
Pick-up : 260-275V
Drop-out : 135-60V
Capacity : 35A
❖