beautypg.com

Installation – EBARA CLU User Manual

Page 6

background image

EBARA Submersible Sewage Pumps

DLU / DLMU

Operating, Installation, and Maintenance

EBARA

Fluid Handling

www.pumpsebara.com

6

(t) 803 327-5005 • (f) 803 327-5097

rev. 01/10

Installation

3. Electrical Wiring:

(1) Wiring

a) Wire as indicated for the appropriate start system as shown in Fig. 3.
b) Loose connections will stop the pump. Make sure all electrical connections are secure.

WARNING

Check that the power is locked off and disconnected before working on pump. All electrical work should be
performed by a qualified electrician and all national and local electrical codes must be observed.

Manual Operation Type – Single Phase

Output 1 to 5HP

U : RED
V : WHITE
Y : BLACK
G : GREEN

❖ Output 1 to 2 HP Model : 3ARR3 FJ10EE3 6×551 (Mfr : GE)

Pick-up : 185-200V
Drop-out : 105-40V
Capacity : 35A

❖ Output 3 to 5HP

Model : 3ARR3 FJ4EK2 6×555 (Mfr : GE)
Pick-up : 260-275V
Drop-out : 135-60V
Capacity : 35A

This manual is related to the following products: