J&M 1326-22T User Manual
Page 30
28
SET-UP INSTRUCTIONS (Continued)
Roll Tarps for Grain Carts
8
Installing the Tarp Stand-Offs
Install each tarp standoff at each end of the
grain cart wall on the off auger side with two
1/4” x 1 1/2 self tapping bolts. Place it about
2” down from the drip edge along side of the
corner brace.
Tarp Stand-Offs
Riveting the Canvas Tarp to the Square Tubing
Stiffening Patch
Insert the 1”x1” 14ga x 192” long square tube into
the sleeve on the Canvas Tarp that is on the oppo-
site side of the Stiffening Patch. Center the can-
vas tarp on the 1” x 1” 14ga x 192” long square
tubing. There should be aproximately 2” (5cm) of
tubing sticking out each end of the tarp. Use a
1/4” drill bit to drill through the canvas tarp and
one wall of the 1” x 1” 14ga x 192” long square
tubing. (See STEP-8.1) Repeat and drill a hole at
the same location on the opposite end of the tub-
ing. Use a hammer to install both 1/4” (6.35mm)
drive rivets.
7
Center the 1” square tube that is riveted to the
canvas tarp on the auger side of the cart. Use
a 3/8” drill bit to drill three holes through the
square tubing and auger side wall of the cart.
The holes should be approximately 2 1/2”
down from the top of the sideboard. Two
holes should be placed 14” from the ends of
the square tubing and the third hole should be
centered on the square tubing. Install the three
stop brackets with three 3/8”-16 x 2” hex bolts
and three 3/8”-16 centerlock hex nuts.
9
Mounting Canvas Tarp to Cart
Stop Brackets
2”
3/4”
Canvas Tarp
Square Tubing
1/4” Rivet
2 1/2”
14”