Set-up instructions – J&M TF215 User Manual
Page 11

Pg. 11
SET-UP INSTRUCTIONS
Step 4 – Installing the Base Unit Baskets 
Secure the torsion-flex arm of the rolling basket 
assembly to the rear tubing member of the Base 
Unit Main Frame using two 5/8” x 4” x 5 1/2" U-
Bolts and 5/8” Lock Nuts. 
 
Make sure the baskets are symmetrically 
placed on the Base Unit Main Frame and 
have a 1 1/2” clearance between baskets. 
 
Note: Be sure the basket assemblies with the 3” 
x 3” torsion arms are secured to the Base Unit 
Main Frame. The rolling basket assemblies for 
the side wings have a smaller 2 1/2” x 2 1/2” 
torsion arm. 
 
Step 5 – Installing the Jack Stand 
Slide the Storage Extension Arm into the square 
tubing on the Base Unit Main Frame as shown 
and secure using one 1/2" x 4 1/2" Grade 5 Bolt 
and 1/2" Lock Nut. Pin the Jack Stand 
Assembly to parking position on the extension 
arm and lower the jack so the weight of the base 
unit is transferred to the jack. Using two 1/4” x 
1” Grade 5 Bolts, mount the SMV emblem to the 
extension arm as shown. (Note: For soil 
conditioners with side wings that are 5’ long or 
smaller. If equipped with side wings longer than 
5’, secure the SMV emblem to the right Wing 
Arm Rest. 
 
Step 6 – Installing the Wings 
Align and connect the hinges on the side Wing 
Frame to the matching hinge assembly on the 
Main Unit Base Frame using two 1 3/4" x 5 1/4" 
Grade 5 Bolt with 1 3/4” Lock Nut. 
 
Connect the Pivot Linkage Arm on the base 
main frame to the center tab on the folding wing 
frame using one 1 3/4" x 4 3/4” Grade 5 Bolts, 
one 1 3/4” Washer and one 7/16” x 2 3/4” Roll 
Pin. 
5/8” x 4” x 5 1/2” U-Bolts
Rolling Baskets with 
3” x 3” Torsion Arm 
SMV Emblem
Jack Stand
Storage Extension Arm
Wing Frame
Align and Secure Corresponding Hinge 
Components 
