
- 8 -
12. Mount fixtures into place.
13. Remove the access panels to access the plumbing and gas. All water, electrical and gas connections
should be performed by a trained professional.
14. Attach the 24.25” x 12” plumbing chases to cleats using #10 x 1-1/2” truss head screws.