Start up – KOSPEL SW User Manual
Page 24
24
SB/SBZ/SW/SWZ Cylinder construction (250,300,400 litres)
16
15
13
14
12
10
11
20
21
17
18
ZW
PG1
6
ZG1
PG2
C
6
ZG2
CW
ш695 (250, 300)
ш755 (400)
G3/4
G1
A
B
G1/2
C
D
E
F
G
H
G3/4
G1
G1
G1/2
G1
G3/4
Start up
Check out the pipe connections and make
sure that you observe the connection dia-
grams before start-up.
Cylinder filling:
•
turn on the valve on cold water supply
pipe,
•
turn on the hot water outlet valve (water
outflow without the air bubbles indicates
that the tank is full),
•
turn off the outlet valves.
Turn on the valves connecting cylinder with
the central and the solar collector heating
system.
Check for water and heating medium leaks.
Check out the safety valve performance in ac-
cordance to valve manufacturer’s instruction.
[6] - sensor pipe
[10] - immersion heater fitting (cork 1½)’’
[11] - lower heating coil
[12] - upper heating coil
[13] - magnesium anode
[14] - thermometer
[15] - thermal insulation
[16] - upper lid
[17] - lower lid
[18] - feet
[20] - ø150 / 115 access hole
[21] - access hole cover
ZW - cold water
CW - hot water
C - circulation
ZG1,ZG2 - heating medium supply
PG1,PG2 - heating medium return
A-H - dimensions described in technical
data table.
I
B
CW
ZG3(1”)
ZG2
C
PG2
ZG1
PG3(1”)
PG1
ZW
Muff location for connection an external heat
exchanger (SWZ and SBZ only)
An upper heating coil (ZG2,PG2
fitting) and upper sensor pipe
are available in SB and SBZ only.