beautypg.com

Start up – KOSPEL SW User Manual

Page 24

background image

24

SB/SBZ/SW/SWZ Cylinder construction (250,300,400 litres)

16

15

13

14

12

10

11

20

21

17

18

ZW

PG1

6

ZG1

PG2

C

6

ZG2

CW

ш695 (250, 300)

ш755 (400)

G3/4

G1

A

B

G1/2

C

D

E

F

G

H

G3/4

G1

G1

G1/2

G1

G3/4

Start up

Check out the pipe connections and make

sure that you observe the connection dia-

grams before start-up.

Cylinder filling:

turn on the valve on cold water supply

pipe,

turn on the hot water outlet valve (water

outflow without the air bubbles indicates

that the tank is full),

turn off the outlet valves.

Turn on the valves connecting cylinder with

the central and the solar collector heating

system.

Check for water and heating medium leaks.

Check out the safety valve performance in ac-

cordance to valve manufacturer’s instruction.

[6] - sensor pipe

[10] - immersion heater fitting (cork 1½)’’

[11] - lower heating coil

[12] - upper heating coil

[13] - magnesium anode

[14] - thermometer

[15] - thermal insulation

[16] - upper lid

[17] - lower lid

[18] - feet

[20] - ø150 / 115 access hole

[21] - access hole cover

ZW - cold water

CW - hot water

C - circulation

ZG1,ZG2 - heating medium supply

PG1,PG2 - heating medium return

A-H - dimensions described in technical

data table.

I

B

CW

ZG3(1”)

ZG2

C

PG2
ZG1

PG3(1”)
PG1

ZW

Muff location for connection an external heat

exchanger (SWZ and SBZ only)

An upper heating coil (ZG2,PG2

fitting) and upper sensor pipe

are available in SB and SBZ only.

This manual is related to the following products: