BVA Hydraulics IEPR5513, IEPRS5513, IAPDR5506, IEPDR5513, IEPDRS5513 User Manual
Page 4
4
Figure 1 - Components for 55-Ton Rolling Head Shop Press.
Electric Pump
Hand/Manual Pump
Air Pump
Air Pump
Pendant
Switch
Cylinder
Upright Channel
Support Pin
Pressure Gauge
Bed Frame
Lower Cross
Member
Winch Assembly
Electric Pump
Platform
Base Frame
Channel
BEFORE USE
1. Before using this product, read the operator’s manual completely and familiarize yourself thoroughly with the
product, its components and recognize the potential hazards associated with its use.
2. Inspect before each use. Do not use if bent, broken or cracked components are noted. Check for and tighten any
loose assemblies.
3. Verify that the product and the application are compatible, if in doubt call
BVA Technical Service.
ASSEMBLY
1. Adjust Bed Frame to lowest position and slacken winch cables.
2. Install Winch Assembly to press using (3) 3/8” bolts, washers and nuts.
3. Secure Cylinder to Cylinder Adapter Plate, and mount Adapter Plate to upper cross member using (4) 1/2” bolts
and washers.
NOTICE: Cylinder comes with carrying handles. Loosen Allen head attachment screws to remove handles.
4. Attach Base Frame Channels to Upright Channels with (4) 1/2” bolts and nuts.
5. Attach Lower Cross Member to Upright Channels with (4) 1/2” bolts and nuts.
6. For Electric Pumps only: Adjust the Pump Platform to desire height and secure with (4) 3/8” bolts, nuts & washers
provided.
7. Connect the Pressure Gauge and the Hydraulic Hose to the Gauge Adapter, then connect the Gauge Adapter to
Pump.
NOTICE: Use thread tape or compound on all threaded hose connections.