Xylem CHATTER Base System Setup Tool Users Guide User Manual
Page 11

MANUAL
GB CHATTER BASE SYSTEM SETUP TOOL 1303
11
Fill in the fields shown in the picture to the right.:
ID Tag
The name from the field ID Tag in the
in
Appendix B
MJK_SN
The serial number from the field Serial nr. in the
in Appendix B
Server Sync
synchronize data with the database running on the server.
APN
The Access Point Name from the field APN in the
in Appendix B
IP Address 1
The IP-address from the field IP address in the
in Appendix B
IP Address 1 - Port
The port number from the field Measurement port in the
in Appendix B
IP Address 2
The IP-address from the field IP address in the
in Appendix B
IP Address 2 - Port
The port number from the field Configuration port in the
in Appendix B
Click the button Write Chatter
Click the button Test Connection
server to verify the communication setup is correct
verified it can connect to the server
Click the button Register Chatter
server to register itself. This might take a
18
18
18
18
18
18
18