3 installation, 1 scope of delivery, 2 installation in the iq sensor net – YSI IQ SensorNet MIQ/PS Module User Manual
Page 9: Installation -1, Scope of delivery -1, Installation in the iq, 3installation

MIQ/PS
Installation
3 - 1
ba76029e01
01/2012
3
Installation
3.1
Scope of delivery
The scope of delivery of the MIQ/PS is listed in the I
NSTALLATION
chapter of the system operating manual.
3.2
Installation in the IQ S
ENSOR
N
ET
The IQ S
ENSOR
N
ET
provides a number of options for integrating the
MIQ/PS mechanically and electrically in the system (stacked mounting,
distributed mounting, etc.). The individual types of installation are
described in detail in the I
NSTALLATION
chapter of the system operating
manual.
Note
To achieve optimum heat transfer, it is recommended to always place
the power supply module at the back of a module stack.
Note
If there are several power supply modules in the IQ S
ENSOR
N
ET
, it is
helpful if all the power supply modules are connected to a single power
supply. As a result, the system can be easily switched on and off from
a single location.