English – Pfister GT49-DC00 User Manual
Page 3
ENGLISH
ENGLISH
7
9
10
8
7 HANDLE FLANGE ATTACHMENT
Place Plastic Ring (7A) and Flange (7B) over Valve Body (7C) covering the Valve Body
Washers (7D). Secure by threading Plastic Nut (7E) onto the Valve Body (7C).
8 HANDLE INSTALLATION
Screw Stem Extender (8A) onto the Valve Stem (8B). With Valves in “Closed” position,
attach Handle (8C) onto Valve Stems (8B) and tighten Set Screws (8D) with the Hex
Wrench (8E) that is provided.
Make sure Set Screw (8D) is securely tightened to Handle (8C).
9 SPOUT BODY ATTACHMENT
Insert Lift Rod (9A) into hole at the back of Spout (9B). Place Plastic Seal Ring (9C)
against the bottom of Spout Base (9D). With Spout (9E) facing forward, carefully install
the Lift Rod (9A) and Shank (9F) through the center hole of sink (9G).
10 SECURING SPOUT BODY
From underneath sink, secure Spout Body (10A) by placing Metal Washer (10B) and
threading Long Nut (
7
/
16
Hex.) (10C) onto Mounting Post (10D). Make sure that the
bumps on Metal Washer (10B) are facing up. Make sure Lift Rod (10E) moves freely.
Firmly hand tighten Long Nut (10C). Secure Long Nut (10C) not to exceed a
1
/
4
turn.
Caution: Do not over tighten!
3
7E
7E
7B
7A
7B
7D
7A
7C
7C
7D
8E
8A
8B
8A
8B
8C
8C
10A
10B
10E
10C
10D
8D
8D
9A
9B
9C
9A
9F
9G
9D
9E