Steps 1-4, Preparation/assembly – Factory Direct Hardware Belle Foret N13001 User Manual
Page 2

Preparation/Assembly
2-1
1
2-2
3-2
3-1
1
Shut off water supply before installation.
2
Remove rubber washer, metal washer, lock nut and spout connector
from the spout shank. Position the spout in the faucet hole of the
sink. Slide the rubber and metal washers up the shank and secure
spout with the lock nut. Wrap end of mounting shank with pipe tape
and reattach spout connector. Do not overtighten.
3
Remove lock nut, rubber washer and metal washer from hot valve
body. Wrap male threaded end of flexible spout connector hose, and
install in bottom of valve body. Insert valve body through the correct
faucet hole, replace rubber and metal washers, and secure with lock
nut.
4
Repeat step 3 for cold valve.
Steps 1-4
Spout
Pipe tape
Pipe tape
Water supply
Rubber washer
Metal washer
Spout connector
Nut
Rubber washer
Metal washer
Valve body
Lock nut
Spout connector hose
Rubber washer
Metal washer
Lock nut