Grain Systems Bin Accessories PNEG-1614 User Manual
Page 8
2. Installation
8
PNEG-1614 Heavy Duty Bin Stairs and Platform Assembly for 2.66" Corrugated Bin
3. The attachment location of the platform wall bracket to the first horizontal seam is shown in
. Attach the platform wall bracket to the first horizontal seam using the middle hole as
. This will locate the platform 16" below the eave. The platform wall brackets are
placed six (6) bolt spaces apart or 56-1/4". Loosely attach the platform wall brackets to the first seam
using 5/16" x 3/4" bin bolts and flange nuts.
Figure 2C
4. Field drill two (2) holes per platform bracket as shown and use 5/16" x 3/4" bin bolts and flange nuts
at the top connection points. The bottom connection points will also be used for the platform knee
brace during platform installation.
5. The first ring will have two (2) stairs attached below the platform. Therefore, the first stair wall
bracket is placed two (2) bolt spaces around the bin on the second ring as shown in
Loosely attach using two (2) 5/16" x 3/4" bin bolts and flange nuts. Field drill the middle attachment
point as shown in
and fasten using a 5/16" x 3/4" bin bolt with a flange nut.
6. Each additional stair wall bracket (LDR-4082) will be placed 32" below the previous and four (4)
standard bolt spaces or 37-1/2" from the previous. There will be a total of four (4) steps for each
additional ring.