beautypg.com

Handrail and mid strap installation – Grain Systems Bin Accessories PNEG-1846 User Manual

Page 21

background image

4. 105' Diameter Exhaust Walk Around Package

PNEG-1846 “X” Series Complete 105' Walk Around Manual

21

Handrail and Mid Strap Installation

1. To complete the installation, attach the handrail and mid strap to the handrail posts using 5/16" x 2"

hardware as shown in

Figure 4F

. Make sure the head of the bolt is installed to the inside of the platform.

Do not tighten bolts until installation is complete to ensure proper fit. The handrails and mid straps will
overlap at each post and should be installed counterclockwise to cover the handrail tab.

Figure 4F