beautypg.com

Grain Systems Bin Accessories PNEG-1615 User Manual

Page 9

background image

2. Installation

PNEG-1615 Heavy Duty Bin Stairs and Platform Assembly for 4.00" Corrugated Bin

9

3. The attachment location of the platform wall bracket to the first horizontal seam is shown in

Figure 2C

. Attach the platform wall bracket to the first horizontal seam using the second hole from

the bottom as shown in

Figure 2C

. This will locate the platform 16" below the eave. The platform wall

brackets are placed six (6) bolt spaces apart or 56-1/4". Loosely attach the platform wall brackets to
the first seam using 5/16" x 3/4" bin bolts and flange nuts.

Figure 2C