beautypg.com

Installation – Grain Systems Bin Accessories PNEG-1615 User Manual

Page 21

background image

2. Installation

PNEG-1615 Heavy Duty Bin Stairs and Platform Assembly for 4.00" Corrugated Bin

21

Figure 2W Upper Handrail Connection

3. After installing the top handrails, the intermediate handrails can be put into place. They will use

the top hole in the middle of the handrail post with 5/16" x 1-1/4" bolts and nut.

(See Figure 2T on

Page 19.)

The large tube should be placed on the upper handrail post and the small tube should be

slid into it and placed on the lower handrail post. The very top intermediate handrail connecting the
platform to the first post may need to be shortened. Equal amounts should be cut from both of
the handrails.

Figure 2X Intermediate Handrail

5/16" x 1-1/4"
Bolt and nut

Four (4) step
handrail (STR1077)

5/16" x 1-1/4" Bin
bolt and nut

Small intermediate
handrail (LDR-4088)

Large intermediate
handrail (LDR-4087)