beautypg.com

Complete stair assembly, Chapter 6 complete stair assembly – Grain Systems Bin Accessories PNEG-1623 User Manual

Page 22

background image

22

PNEG-1623 Roof Stairs and Handrail Assembly

6. Complete Stair Assembly

Figure 6A

NOTE: Start roof stair assembly with three (3) step bottom section (LDR-5129). Center the roof stair

sections over the roof panel. Attach the appropriate number of two (2) step, three (3) step or
four (4) step sections to the bottom section. Refer

Chart on Page 14

for the correct number of

sections. 72' and larger bins will require a transition stair package. See details

on Pages 31-33

for instructions. Field drill as necessary. All sections will attach to the roof panels with
5/16" x 1-1/4" bolts and nuts. Field drill the rib spanning brackets and the roof ribs to attach
the stair sections to the roof ribs.

See Figure 7A on Page 23.

See Figure 9A on Page 30.