Grain Systems Unload Augers PNEG-1443 User Manual
Rack and pinion installation, Instructions, 8" and 10" rack and pinion
Date: 01-18-10
PNEG-1443
Instructions
1004 East Illinois Street • Assumption, IL 62510 • 1-217-226-4421
PNEG-1443
Page 1 of 4
Printed in the U.S.A.
Copyright © 2010 by GSI Group
www.gsiag.com
8" and 10" Rack and Pinion
Rack and Pinion Installation
1. Make sure all gates are fully closed.
2. Slip rack and pinion tube over center gate control rod and align holes. Make sure rack and pinion is
fully extended toward bin wall.
3. With rack and pinion resting on unload tube and with tube holes aligned, insert one 5/16" x 1-3/4"
bolt through the rack and pinion tube and center gate control rod. Fasten together with a nut.
4. Slide wrench assembly over shaft on rack and pinion. Make sure the collar faces the gears. Fasten
down with 3/8" flat washer and 3/8" x 3/4" hex bolt.
Figure 1