beautypg.com

Grain Systems Unload Augers PNEG-1443 User Manual

Rack and pinion installation, Instructions, 8" and 10" rack and pinion

background image

Date: 01-18-10

PNEG-1443

Instructions

1004 East Illinois Street • Assumption, IL 62510 • 1-217-226-4421

PNEG-1443

Page 1 of 4

Printed in the U.S.A.
Copyright © 2010 by GSI Group
www.gsiag.com

8" and 10" Rack and Pinion

Rack and Pinion Installation

1. Make sure all gates are fully closed.

2. Slip rack and pinion tube over center gate control rod and align holes. Make sure rack and pinion is

fully extended toward bin wall.

(See Figure 1.)

3. With rack and pinion resting on unload tube and with tube holes aligned, insert one 5/16" x 1-3/4"

bolt through the rack and pinion tube and center gate control rod. Fasten together with a nut.

(See Figure 1.)

4. Slide wrench assembly over shaft on rack and pinion. Make sure the collar faces the gears. Fasten

down with 3/8" flat washer and 3/8" x 3/4" hex bolt.

(See Figure 2 on Page 2.)

Figure 1

Table of contents