Distributor pipe control - farm/commercial – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1793 User Manual
Page 6

Page 6 of 8
PNEG-1793
Distributor Pipe Control - Farm/Commercial
8. Assemble the inner mount pipe control bracket (DPC0005) to the pipe control bracket brace
(DPC0021) using the same method as the intermediate guide assembly.
Attach the eight (8) hole index plate (DPC0010) to the outer pipe guide bracket (DPC0018)
using 3/8" x 3/4" bolt (S-7105), 3/8" flat washer (S-248) and 3/8" flange nut (S-10028).
9. Assemble the clamp band as shown by fastening the clamp rod weldment (DSP16003) to the clamp
band (DSP16002) using 1/2" flange nuts (S-8506) onto the rod ends. Attach the index plate mount
angle (DPC0009) to the front of the clamp bands (DSP16002) with 3/8" x 1" bolts (S-7469),
3/8" flat washers (S-248) and 3/8" flange nuts (S-10028).
10. Attach the control lever assembly to the trunking using two (2) 3/8" x 1" bolts (S-7469),
3/8" flat washers (S-248) and 3/8" flange nuts (S-10028) and secure to the guide using
1/4" x 3/4" x 3" U-bolt (S-10145) and four (4) 1/4" flange nuts (S-7215).
Figure 6 Control Lever Assembly to Trunking