Figure 3 – Banks Power Ford Trucks: (Gas ’87 - 97 7.5L EFI) PowerPack, Stinger & TorqueTube system '87-97 For Use w_ 460 EFI Engine User Manual

Page 7

background image

7

P.N. 96352

FIGURE 3

washer must face each other when installed on bolt.

See Figure

1

for proper washer installation.

12.

Install left-hand Banks TorqueTube manifold from

under the vehicle. Use two bolts to temporarily

hang and position the manifold on the cylinder head.

Thread EGR tube and air injection tube (if equipped) in

fittings on Banks TorqueTubes. NOTE: Early-model air

injection systems require an adapter nipple (supplied)

for hook-up, see Figure

2

.

Because of the tight confines, we suggest that the EGR

tube and air injection tube (if equipped) be tightened

into the manifold with the manifold loosely attached

to the head (this allows for some additional freedom of

movement). In some cases, the EGR and air injection

tubes may have to be tightened with the manifold

completely separated from the head, then bolted to

the head when wrenching the tubes is completed. Air

injection tube may be loosened from its upper support

bracket to aid in alignment during installation. A dab of

anti-seize on the tube threads will aid in assembly.
Once this procedure is complete, install remaining

manifold bolts finger tight, with anti-seize applied. See

Figure 2 for bolt locations. Reinstall dipstick tube and

dipstick, bolt dipstick to tab on manifold with hardware

indicated in Figure

2

.

13.

Reinstall sparkplugs and sparkplug wires.

Sparkplug wire heat shields should be positioned

between sparkplug wire boot and manifold