beautypg.com

2 mounting steps, 3 mounting steps, external housing – VEGA VEGABAR 52 Foundation Fieldbus - climate compensated User Manual

Page 14

background image

14

4 Mounting

VEGABAR 52 • Foundation Fieldbus - climate compensated

36789-EN-130321

4.2 Mounting steps

For mounting VEGABAR 52, a welded socket is required. You can find

these components in the supplementary instructions manual "Welded

socket and seals".

Use the seal fitting belonging to the instrument, or in case of NPT

connections, a high-resistance sealing material.

Screw VEGABAR 52 into the welded socket. Tighten the hexagon

on the process fitting with a suitable wrench. Wrench size, see

chapter "Dimensions".

Warning:

The housing must not be used to screw the instrument in! Applying

tightening force can damage internal parts of the housing.

Seal the flange connections according to DIN/ANSI with a suitable,

resistant seal and mount VEGABAR 52 with suitable screws.

Use the seal suitable for the respective process fitting. You can find

the components in the supplementary instructions manual "Welded

socket and seals".

4.3 Mounting steps, external housing

1. Mark the holes according to the following drilling template
2. Depending on the mounting surface, fasten the wall mounting

plate with 4 screws

90 mm (3.54")

R 3,5 mm

(0.14")

3mm

(0.12")

70 mm (2.76")

8 mm

(0.32")

93 mm (3.66"

)

110 mm (4.33"

)

Fig. 6: Drilling template - wall mounting plate

Welding the socket

Sealing/Screwing in

threaded versions

Sealing/Screwing in

flange versions

Sealing/Screwing in

hygienic fittings

Wall mounting