6
Setup
6
.1 Setup
Setup is carried out according to the operating instructions manual of
the respective sensor.
Make sure that the measuring system is in the water for setup.
Tip:
If setup is not possible in the original vessel, then fill a suitable vessel
(ø approx. 400 mm, height approx. 150 mm) with water and place the
measuring system with float inside the vessel. The measuring result
can be transferred to the original vessel.
Proceed as follows:
1
Connect probe and signal conditioning instrument
2
Switch on power supply
3
Turn the A/B switch on the signal conditioning instrument to
position B
The relay deenergizes if an oil layer is detected (safe condition)
0
10
5
521
on
1
2
4
3
5
6
7
8
9
10
11
12
13
14
on
min.
!
VEGATOR 621EX
0
10
5
1
2
Fig. 4: Suitable signal conditioning instruments
1
Potentiometer
2
Relay control lamp
4
Set potentiometer (1) to 0. The relay control lamp (2) lights.
5
Turn the potentiometer (1) slowly clockwise until the relay control
lamp (2) extinguishes.
6
Turn the potentiometer (1) very slowly anticlockwise until the relay
control lamp (2) lights.