beautypg.com

3 exchange of the process fitting – VEGA VEGABAR 40 4 … 20 mA User Manual

Page 27

background image

VEGABAR 40 (4 … 20 mA)

27

6.3 Exchange of the process fitting

The process fitting on VEGABAR 40 can be
easily exchanged.

• First loosen the three screws on the lower

side of the housing with a hexagon socket
size 5.

• Remove the process fitting in the direction

of the arrows from the sensor so that the
connection cable is not damaged.

• Pull out the plug connection.

Plug connection

Hexagon head
screws

Notes

For mounting the other process fitting, pro-
ceed in reverse sequence:
• Insert the cable from the sensor into the

process fitting.

• Plug the process fitting and the sensor

together.

• Screw the process fitting to the sensor,

only use the original screws and plain
washers.

Note:

When switching on (connection of supply
voltage) for the first time after exchanging the
electronic unit, it will take approx. 20 s until
the actual measured value is displayed.