Performing a control test – Акку-Чек Перформа Нано User Manual
Page 55

Performing a Control Test
You need the meter, a test strip, and control solution Level 1 and/or Level 2.
The control level is printed on the bottle label.
1. Insert the test strip into the meter in
the direction of the arrows. The meter
turns on.
2. Make sure the code number on the
display matches the code number on
the test strip container. If you miss
seeing the code number, remove the
test strip and reinsert it into the meter.
53
44702_EN_PNano_24_Ins.indd 53
44702_EN_PNano_24_Ins.indd 53
10/9/09 2:39:00 PM
10/9/09 2:39:00 PM