Install the “h” server bezel – 8e6 Technologies Threat Analysis Reporter TAR 1.0 User Manual
Page 12

8
8
e
6 T
hreaT
a
nalysis
r
eporTer
Q
uick
s
TarT
G
uide
Install the “H” Server Bezel
Before rack mounting the “H” unit, the bezel should be installed on the front end of the
chassis. This portion of the installation process requires you to unpack the unit and be-
zel.
NOTE: The bezel has been packaged separately from the unit to prevent dam-
age during shipping.
Front of bezel
Outside of left inner rail
Inside front end of left inner
rail
Inner left rail attached to chassis
Pin on right side of bezel