Technical specifications, Installation instructions, Positioning – Zanussi TCE 7124 W User Manual
Page 14: Unpacking
14
Positioning
It is recommended that, for your convenience, the
machine is positioned close to your washing
machine.
The tumble dryer must be installed in a clean place,
where dirt does not build up.
Air must be able to circulate freely all round the
appliance. Do not obstruct the front ventilation grille
or the air intake grilles at the back of the machine.
To keep vibration and noise to a minimum when the
dryer is in use, it should be placed on a firm, level
surface.
Once in its permanent operating position, check that
the dryer is absolutely level with the aid of a spirit
level. If it is not, raise or lower the feet until it is.
The feet must never be removed.
Do not restrict the floor clearance through deep-
pile carpets, strips of wood or similar. This might
cause heat build-up which would interfere with
the operation of the appliance.
Unpacking
Warning !
Slide out the polythene bag containing the
polystyrene block before using the appliance.
Should the appliance be moved, it must be
transported vertically.
P1106
Technical Specifications
DIMENSIONS
Height
85 cm (33.5”)
Width
60 cm (23.6”)
Depth
58 cm (22.8”)
POWER SUPPLY VOLTAGE
230-240 V/50 Hz
TOTAL POWER ADSORBED
2450 W (13A)
MAX LOAD CAPACITY
Cotton, linen
6 kg (13.2 lbs)
Synthetics
2.5 kg ( 5.5 lbs)
DRUM VOLUME
108 l
CONSUMPTIONS
Cotton, linen
4.37 kWh (6 kg store dry)
Cotton, linen
3.6 kWh (6 kg iron dry)
Synthetics
1.4 kWh (2,5 kg store dry)
This appliance complies with the following E.E.C. Directives:
- 73/23 EEC of 19.2.73 (Low Voltage Directive) and subsequent modifications;
- 89/336 EEC of 3.5.89 (Electromagnetic Compatibility Directive) and subsequent modifications.
Installation Instructions
It is dangerous to alter the specifications or
attempt to modify this product in any way.
Care must be taken to ensure that the appliance
does not stand on the electrical supply cable.
Any electrical work required to install this
appliance should be carried out by a qualified
electrician or competent person.
125992080.qxd 4/29/03 10:51 AM Pagina 14 (Nero/Process Black pellicola)