beautypg.com

Installa tion - moun ting the r ange hood – Zephyr Duo Is. ADL-M90ASX User Manual

Page 19

background image

5. Position hole template

on the ceiling paying at-
tention that the arrow is
positioned on the same
side as the range hood
controls.

- Make 4, holes in the ceiling

and drive in (3 type C)
screws without completely
tightening them. Pay attention not to insert
the screw into the hole marked with an X on
the hole template Fig.14

6. Lift the hood assembly to the ceiling and

align the top support frame with the (3)
screws previously installed in the ceiling.

- Rotate assembly slightly clockwise to

lock in place. Fig.15A. Drive in the fourth
screw (type C) and tighten the remaining 3
screws to secure the structure in place. Fig.15B

7. Extend the upper duct cover and secure it to the top support frame by using

(2 type B) screws. Fig.16

8. Verify that ducting from hood is connected to ducting in the attic that will

exhaust air out of the home.

NOTE: For the various installations use screws and screw anchors suited to the
type of ceiling (minimum screw size: 1/4" diameter x 2-3/4" length).

Installa

tion - Moun

ting the R

ange Hood

- 19 -

This manual is related to the following products: