Installation instructions, Pressure testing – Zanussi ZUG 78 User Manual
Page 46

PRESSURE TESTING
To pressure test connect the pressure gauge to
the main oven injector
1 Check the supply pressure by turning the
grill on and oven thermostat to Mark 9. Then
turn on the electricity supply. Allow the grill
burner to light.
The pressure should be:
Natural Gas
20mbar
L.P.G. Gas
The pressure must be set to
28mbar for use on butane
or 37mbar for use on
propane.
2 Turn off the electricity supply and the
thermostat; disconnect the pressure gauge.
46
ZUG 78 - 311359904
INSTALLATION INSTRUCTIONS
See also other documents in the category Zanussi Kiln:
- easySteam FCZ061GBD (3 pages)
- Tuttopizza PME435 (2 pages)
- ZBM 890 (30 pages)
- ZDF490 (36 pages)
- ZCE 7700X (36 pages)
- easySteamPlus 237020 (3 pages)
- easySteam 238020 (3 pages)
- ZOB550XL (16 pages)
- easySteam FCZ202EBA (3 pages)
- ZDQ 895 (48 pages)
- ZCE 8020AX/CH (36 pages)
- MULTI BUILT-IN OVENS ZBM 762 (16 pages)
- ZOB 1060 (28 pages)
- SLG802 (2 pages)
- ZBQ 965 (28 pages)
- ZCG 6200 (40 pages)
- ZCE 7200 (28 pages)
- Tuttopizza PDE830 (2 pages)
- ZOU 342 (12 pages)
- easySteamPlus FCZ201GAD (3 pages)
- ZOU 481 (32 pages)
- ZPB 1260 (24 pages)
- easySteamPlus 237502 (3 pages)
- ZOB 652 (12 pages)
- ZOP37902 (24 pages)
- ZBD 902 (25 pages)
- easySteamPlus 237503 (3 pages)
- easySteam 238014 (3 pages)
- ZCM 1030 X (12 pages)
- ZBF 360 (20 pages)
- ZCE 5001 (32 pages)
- BMS 841 (16 pages)
- Tuttopizza 291582 (2 pages)
- ZYB 460 (20 pages)
- SLE9014 (2 pages)
- easySteamPlus 237024 (3 pages)
- ZBF 863 (22 pages)
- easySteam FCZ102GBG (3 pages)
- ZCE 7551X (36 pages)
- ZSA 25 (19 pages)
- ZCE 7702 (36 pages)
- easySteam 238512 (3 pages)
- Tuttopizza 603327 (2 pages)
- ZBS863 (24 pages)
- ZBF 610 (11 pages)