beautypg.com

Check thermostat operation, C. electric heat systems, Fan operation – White Rodgers 37-5086B User Manual

Page 7: Heating system

background image

7

ON

1

2

3

Switch #1 OFF
Switch #2 OFF
Switch #3 (see step B5)

2.

Manual Changeover (Heating/Cooling Systems
Only)

3.

Heat Only Systems

4.

Cool Only Systems

5.

Computed Energy Management Recovery
(EMR)
— With EMR enabled, system will be ener-
gized before the next program period begins, to
achieve programmed temperature by the beginning
of the next program period (the thermostat’s micro-
computer calculates 15 minutes for every 2

°

F tem-

perature change). For example, assume that the
thermostat is programmed to provide an overnight
heating temperature of 62

°

F, and during the next

program period, programmed to begin at 6:00 AM, the
programmed temperature is 70

°

F. With EMR acti-

vated, the thermostat will automatically activate the
heating system at 5:00 AM, so that the programmed
temperature of 70

°

F is reached by about 6:00 AM.

C. ELECTRIC HEAT SYSTEMS

For central electric heat systems where the blower is
energized by a separate circuit through the fan relay
(meaning that the fan turns on immediately on call for
heat), clip wire W14 on the back of the thermostat (see fig.
13). If the thermostat is energizing electric heat sequenc-
ers, DO NOT clip wire W14.

CHECK THERMOSTAT OPERATION

When checking thermostat, Group B option switches #1
and #2 for automatic changeover must be in the OFF
position. This will allow temporary setting of heat setpoints
above cool setpoints. After system checkout, reset Group
B option switch #1 to ON position if automatic changeover
is desired (see SET GROUP B OPTION SWITCHES).

FAN OPERATION

1.

Turn on power to the system. If the heat source has
a standing pilot, be sure to light it.

2.

Press

FAN

SWITCH

until FAN ON is displayed. The blower

should begin to operate (this will work only on sys-
tems with a G terminal).

On three-wire heat only systems, or on four-wire heat/
cool systems, if the thermostat display is operating

properly, but the fan does not operate when

FAN

SWITCH

is pressed, the red jumper wire (provided with thermo-
stat) may not be properly installed between the RH
and RC terminals. Disconnect electrical power to
system and properly install the jumper wire per the
appropriate wiring diagram.

3.

Press

FAN

SWITCH

until FAN AUTO is displayed. The

blower should stop operating within approximately
one minute.

HEATING SYSTEM

1.

Press

SYSTEM

SWITCH

until HEAT is displayed (it may already

be displayed).

2.

Press

to adjust thermostat above room tem-

perature to call for heat. The heating system should
begin to operate.

(Instructions continue on next page.)

LOCKOUT BYPASS OPTION

FOR QUALIFIED SERVICE TECHNICIANS’ USE
ONLY. OPERATORS SHOULD NOT USE THIS FEA-
TURE DUE TO POSSIBILITY OF EQUIPMENT OR
PROPERTY DAMAGE, OR PERSONAL INJURY.

COMPRESSOR SHORT TERM

CYCLE PROTECTION

This thermostat has a built-in short term (5-minute)
time delay. During this 5-minute period, the thermo-
stat will lock out the compressor to allow head pres-
sure to stabilize. If you want to override this feature

while testing thermostat operation, simply press

ADV

PRGM

and

HOLD
TEMP

buttons at the same time at initial startup.

DO NOT USE THE LOCKOUT BYPASS OPTION
UNLESS THE COMPRESSOR OIL HEATERS HAVE
BEEN OPERATIONAL FOR 6 HOURS AND THE
SYSTEM HAS NOT BEEN OPERATIONAL FOR AT
LEAST 5 MINUTES.

ON

1

2

3

Switch #1 OFF
Switch #2 ON
Switch #3 (see step B5)

ON

1

2

3

Switch #1 ON
Switch #2 ON
Switch #3 (see step B5)

ON

1

2

3

Switch #1 (see steps B1–B4)
Switch #2 (see steps B1–B4)
Switch #3 OFF

NOTE

This manual is related to the following products: