Weider WESY19740 User Manual
Page 13
13
22. Route the Low Cable (53) under a 90mm Pulley
(48). Attach the Pulley and two Half Finger
Guards (43) to the Base (1) with an M10 x 46mm
Bolt (81) and an M10 Nylon Locknut (56).
Make
sure the Finger Guards are on the outside of
the bracket as shown.
24.
Locate the High Cable (55). Route the Cable up
through the Top Frame (4) and over a 90mm
Pulley (48). Attach the Pulley inside of the Top
Frame with an M10 x 67mm Bolt (71), two M10
Washers (57), two 12mm Spacers (52), and an
M10 Nylon Locknut (56).
25. Route the High Cable (55) over a 90mm Thin
Pulley (47) and down through the Top Frame (4).
Attach the Pulley inside of the Top Frame with an
M10 x 67mm Bolt (71), an M10 Washer (57), and
an 11mm Spacer (49).
Make sure that the
Pulley does not fall out of the Top Frame while
completing steps 26 and 27.
23. Attach the Low Cable (53) to the “U”-bracket (45)
with an M8 Washer (59) an an M8 Nylon Locknut
(58).
See the inset drawing. Do not overtighten
the Locknut; it should be threaded onto the
end of the Cable so that only two threads are
showing above the nut.
22
23
24
25
53
48
43
1
43
81
56
53
45
58
58
45
59
53
56
4
55
52
52
57
57
48
71
4
55
49 57
47
71