beautypg.com

New installation, Lgb-6 to lgb-20, Series 2 – control supplement – Weil-McLain LGB-6 User Manual

Page 2

background image

LGB-6 to LGB-20

Series 2 – Control Supplement

Part Number 550-141-816/0304

2

I

New installation

1. Remove all burners from base box assembly. Remove 3.95 mm natural gas main burner

orifices in manifold. Install 2.40 mm propane gas main burner orifices. Use pipe dope
sparingly only on male ends. Use pipe dope compatible with propane gases. Do not
overtighten orifices.

2. Install pilot burners and flame sensor(s). See Figures 1 and 2 (page 3). Follow Table 1,

below for electronic pilot burner (UCS), standing pilot burner (Q327) and flame sensor
locations on manifold.

3. Install gas controls and ignition control panel as shown in Table 2, below and Figure 6

(page 12).

4. Attach pilot switch box to interior jacket panel. See Figure 6 (page 12). Connect

thermocouple from standing pilot to switch box. Cut 60” pilot tubing into 2 pieces to
make connections from pilot valve to pilot switch box and from pilot switch box to
standing pilot.

5. Attach:

a. 550-223-710 label at boiler operating instruction label. Place so that this label reads

first.

b. 550-223-796 label at rating label.
c. Wiring diagram on door (one on each base).

No. 1

No. 2

No. 1

No. 2

No. 1

No. 2

No. 1

No. 2

No. 1

No. 2

No. 1

No. 2

LGB-6

2

--

9

--

6

--

LGB-14

2

16

13

25

8

21

LGB-7

2

--

11

--

7

--

LGB-15

2

16

13

27

8

22

LGB-8

2

--

13

--

8

--

LGB-16

2

18

15

29

9

24

LGB-9

2

--

15

--

9

--

LGB-17

2

18

15

31

9

25

LGB-10

2

--

16

--

9

--

LGB-18

2

20

16

33

9

27

LGB-11

2

--

16

--

9

--

LGB-19

2

20

16

34

9

27

LGB-12

2

--

16

--

9

--

LGB-20

2

22

16

36

9

29

LGB-13

2

14

11

23

7

19

* From left burner

Electronic
Pilot Burner*

Standing
Pilot Burner*

Boiler
Model
Number

Boiler
Model
Number

Flame Sensor*

Electronic
Pilot Burner*

Flame Sensor*

Standing
Pilot Burner*

Table 1

Pilot burner and flame sensor

locations

Table 2

Gas control arrangement

Left base

Right base

Left base

Right base

LGB-6

A and B

1"

--

LGB-14

I

1"

1"

LGB-7

A and B

1"

--

LGB-15

J

1"

1"

LGB-8

C and D

1"

--

LGB-16

J

1"

1"

LGB-9

C and D

1"

--

LGB-17

J

1"

1"

LGB-10

E, F and G

1 ¼"

--

LGB-18

K

1 ¼"

1"

LGB-11

E, F and G

1 ¼"

--

LGB-19

L

1 ¼"

1 ¼"

LGB-12

E, F and G

1 ¼"

--

LGB-20

L

1 ¼"

1 ¼"

LGB-13

H

1"

1"

Boiler
Model
Number

Propane
Carton

Inlet Pipe Size

Boiler
Model
Number

Propane
Carton

Inlet Pipe Size