beautypg.com

Weil-McLain CGs SERIES User Manual

Page 2

background image

06/10/08

2

a) Full intent of these specifications, and provide complete submittal including

literature, wiring diagrams, fuel piping diagrams, and a list of similar installations.

b) Submittal to be presented to specifying engineer at least seven working days for

approval before bid opening. Substitutions are not permitted after contract is
awarded.

c) Energy Management Control System(s) must be tested and approved for

installation with specified boiler by boiler manufacturer.

B. Boiler

construction

1. Boiler

sections

a) Assembled with tie rods.
b) Parallel ground sealed with high temperature silicone sealant to assure permanent

gas-tight seal.

c) Sealed water-tight by elastomer sealing rings, not cast iron nipples. Each port

opening is machined to accept elastomer sealing rings between sections.

d) Provided with sufficient tappings to install required controls.

2. Boiler(s)

a) Provided with cast-in air elimination to separate air from circulating water.
b) Provided with expansion tank tapping to divert separated air to expansion tank.
c) Constructed to provide balanced water flow through entire section assembly using

single supply and return connections for water. No external headers are necessary.

d) Designed with a low silhouette to provide maximum headroom.
e) Elastomer sealing rings are to be used to provide permanent water-tight seal

between sections. Unlike cast iron or steel push nipples, the elasticity of the seals
fills any gaps caused by misalignment or expansion or contraction.

f) Shipped with insulated heavy gauge steel jacket(s) with split top for easy servicing

and coated with durable powdered paint enamel finish.


C. Boiler

foundation(s):

Installer to construct needed support and level concrete foundation(s) where boiler
room floor is uneven or will not support the weight of the boiler(s).

D. Boiler

trim:

1. All electrical components to be of high quality and bear the U.L. label.

a) Water boiler(s) controls furnished:

1) High temperature limit setting to be 140 – 240 degrees.
2) Combination

pressure-temperature gauge with dial clearly marked and easy to

read.

3) ASME certified pressure relief valve, set to relieve at 30 PSIG. Optional relief

valves available up to and including maximum allowable pressure. Side outlet
discharge type; contractor to pipe outlet to floor drain or near floor, avoiding any
area where freezing could occur.