beautypg.com

Installation – Vanguard Heating LogMate FB32NCA User Manual

Page 11

background image

www.desatech.com

105604-01H

11

7. Plug in blower power cord.

a. If your firebox is installed as a freestanding

unit, determine whether the power cord

will exit the left side or the right side of the

firebox. Install 1 plastic bushing provided

into the 1

1

/

2

" hole in the floor support on

the exit side. Install the second plastic

bushing provided into the 1

1

/

2

" hole in the

outer casing through which the power cord

will exit (see Figure 11). Route power cord

through both plastic bushings and plug the

power cord into a 3-prong grounded wall

receptacle near the firebox.

b. If your firebox installation is recessed

and/or pre-wired, see Built-In Installation

of Blower Accessory

, column 2.

8. Turn on power to duplex outlet if previously

turned off per the warning in step 1.

9. Check to make sure that the power cord is com-

pletely clear of the blower wheel and that there

are no other foreign objects in blower wheel.

Turn blower on and check for operation.

WARNING: Never touch the

blower wheel while in operation.

10. Peel off the backing paper and stick the sup-

plied wiring diagram decal on the firebox

bottom approximately 12" in front of the

blower.

11. Replace bottom of firebox. Note: Make sure

the back of the firebox bottom slides under

the rear of the firebrick (lift the firebrick up if

necessary.)

12. Reattach firebox bottom using 4 screws re-

moved in step 1. Note: Discard the remaining

hardware items.

13. Install the log set heater according to the instal-

lation instructions supplied with the heater.

INSTALLATION

Continued

NOTICE: A qualified electrician

must connect electrical wiring to

duplex outlet for built-in instal-

lation. Follow all local codes. In

absence of local codes follow

The National Electrical Code

ANSI/NFPA 70.

Built-In Installation of Blower Accessory
1. Before replacing bottom of firebox, remove

screw holding duplex outlet to the support

bracket in the bottom of firebox. Remove

duplex outlet.

2. Clamp electrical cable into firebox through

smallest hole in outer casing using strain relief

provided.

3. Route wires from electrical box through hole

in side of heater and hole in support bracket

(see Figure 12).

4. Connect wires from the electrical box to

duplex outlet. Match wire colors to those

indicated on duplex outlet. Be sure to connect

ground wire.

5. Replace duplex outlet with screw.
6. Plug blower power cord into duplex outlet.
7. Replace bottom of firebox.

Figure 11 - Installing Plastic Bushing for

Power Cord

Plastic
Bushing

Figure 12 - Routing Blower Accessory

Power Cord for Built-In Installation

Screw

Blower
Power Cord

Support Bracket

Cables From
Electrical Source

Duplex
Outlet

Blower

Operating the Blower
Light your gas appliance with the blower off. After

about 15 minutes, turn the blower on to deliver

heated air at the top louvers. The blower features

a variable control which allows you to select the

speed you desire.
Note: Periodically check the louvers of the firebox

and remove any dust, dirt, or other obstructions.