beautypg.com

Grupad.o.o – Toshiba RBC-AMS41E User Manual

Page 14

background image

GRUPAd.o.o.

Scheduled operations

13

EN

How to execute scheduled operations

• On the screen of the remote controller whose power

has been turned on, check that the current day of the
week and clock time are set accurately.
Scheduled operations cannot be executed while the
days of the week display, the day arrow

and

numeric display are still blinking.

• Set at least one operation program.

Check that at least one operation reservation display

is indicated below the days of the week on the

remote controller screen.

1

Push the

button (48).

• Although first extinguished on the timer

function display, the symbol shown on the
right now starts blinking.

2

Push the

button (42) within 5 seconds of

completing step 1.

• The symbol on the timer function display stops

blinking and lights.

How to release a scheduled operation

1

Push the

button (48).

• The symbol on the timer function display changes

from the lighted status to blinking.

2

Push the

button (41) within 5 seconds of

completing step 1.

• The symbol on the timer function display stops

blinking and goes off.

• Trouble may be to blame if the ERROR display

remains lighted for 3 seconds while a

scheduled operation is being executed or while a
scheduled operation program is being input. Check for
trouble, and remedy it.

1

When the

button (42) was pushed while a

scheduled operation was being executed:

• The current day of the week and/or current clock

time have not been set. Proceed with the clock
setting operation.

• No programs have been set. Input the operation

program.

2

When the

button (42) was pushed while a

program was being input:

• One setting time overlaps another setting time.

Change one of the setting times.

• Programs are checked using the program input

screen.

1

Push the

button (46).

• The display transfers to the program input screen.
• The entire LCD screen blinks.

2

Push the

button (45).

• Repeatedly push the button until the day arrow

moves to the position above the day of the week
whose program is to be checked.

3

Push the

button (42).

• Enter the day of the week whose program is to be

checked.

• The days of the week display and day arrow

stop blinking and light up.

4

Push the

button (37).

• Each time this button is pushed, the program

number and editing type are scrolled forward in
sequence on the numeric display.

• Display the number of the program to be checked,

and check the program’s settings.
* Unless the

button (42) is pushed, the key

operations are canceled, in which case the
program settings will remain unchanged.

5

After completing the check, push the

button

(46) to return to the original screen.

Scheduled operation setup

Error displays

Program check operation

MB FRIGO Grupa d.o.o., Bani 81, 10010 Zagreb, www.toshiba.hr, e-mail: [email protected]