True Food Service Equipment, Inc.

A. Set unit in its final location. Be sure there is adequate

ventilation in your room. Under extreme heat

conditions, (100°F+, 38°C+), you may want to install

an exhaust fan.

WARNING

Warranty is void if ventilation is insufficient.

B. Proper leveling of your TRUE cooler is critical to

operating success (for non-mobile models). Effective

condensate removal and door operation will be

effected by leveling.

C. The cooler should be leveled front to back and side to

side with a level.

D. Ensure that the drain hose or hoses are positioned in

the pan.

E. Free plug and cord from the top of the cabinet (do

not plug in).

F. The unit should be placed close enough to the

electrical supply so that extension cords are never

used.

WARNING

Cabinet warranties are void if OEM power cord is tampered

with. True will not warranty any units that are connected to

an extension cord.

Optional

A. It may be necessary to seal the cabinet to the floor for

local sanitary codes or if the customer so desires. TRUE

recommends either of the following methods:

B. Using a vinyl cove base trim as produced by

Armstrong, Johnson, or Kentile (available at floor

covering suppliers) or using mastics available at hard-

ware stores.

C. When applying the cove base trim, thoroughly clean

both the cabinet and floor of dirt and grease. Apply a

recommended contact cement to the cove base trim.

After cove base trim has dried, fill in cracks and

joints with a caulking material.

D. When applying a mastic, draw an outline of the cabi-

net on the floor. Raise and block the front side of the

cabinet. Apply a bead of mastic to the floor 1/2”

inside the outline drawn. Lower the cabinet. Raise and

block the rear side of the cabinet. Apply the bead of

mastic, lower the cabinet.

LEVELING

SEALING CABINET TO FLOOR

INSTALLATION / OPERATION INSTRUCTIONS

Full double door pass thru units have two shipping

brackets on the inside of the unit. These two brackets

need to be removed once the unit has been placed into

its final location.
Shipping Bracket Removal

A. After unit has been placed into a final location open

the front and rear doors for easy access to the two

brackets (see image 1).

B. Use a flat head screw driver to loosen the thumb

screws from the brackets. Each bracket has two

thumb screws on each end and four in the middle

(see image 2).

WARNING

Be careful not to scratch or damage the cabinet when

removing the bracket.

PASS THRU UNIT INSTALLATION

Bracket location.

Bracket removal. Thumb screw locations.

WARNING

Any relocation of this unit requires

shipping bracket to be reinstalled

before proceeding.

1

2