beautypg.com

Technicolor - Thomson TS 870 User Manual

Page 14

background image

TS 870 TRANSFER SWITCH

PM062 REV 5 08/05/05

10

Thomson Technology

the load to the generator supply. The utility source will be locked out and the load will

remain on the generator supply until the TSC 80 alarm signal is manually reset.

Refer to the TSC 80 Instruction Manual for further details on Transfer Fail operation.

Should the generator power switching device trip open due to an over current

condition, TSC 80 transfer controller will initiate transfer of the load to the utility

supply. The generator source will be locked out and the load will remain on the utility

supply until the TSC 80 alarm signal is manually reset.

5.2.3. SERVICE DISCONNECT PROCEDURE

To perform a service disconnect (i.e. to disconnect the utility and generator supplies),

the following procedure is required:

1. Move the "Service Disconnect" control switch located on the door of the

transfer switch to the "Disconnected" position.

2. Verify that the "Service Disconnected" pilot light is illuminated. If the Light

is illuminated, the service has been successfully disconnected and it is safe to

perform any maintenance procedures as required. In this condition, the

transfer switch is in the neutral position, with both utility and generator transfer

power switching devices open. The transfer switch will remain in this

condition, regardless of condition of the utility and generator supplies (i.e. if

the utility power fails, the generator will not receive a start signal, nor will the

transfer switch move to the generator position). NOTE: If the Service

Disconnect Light is not illuminated, additional procedures are required (refer

to the following procedure #5.2.4).

3. Attach safety lockout padlock to the "Service Disconnect" control switch to

prevent unauthorized change in operating condition and verify transfer switch

door is locked closed. If the door is not locked, turn and remove door key.

WARNING!

Close and lock the transfer switch enclosure door

before connecting power sources.

4. To reenergize the load, remove the padlock(s) from the service disconnect

control switch, and move the switch to the energized position. The transfer