beautypg.com

Toshiba CARRIER RAV-SP300AT2-UL User Manual

Page 104

background image

– 104 –

No.

‡

Part name

Compressor
Compressor lead

(Continued)

Procedure

2. Mounting of compressor

1) Mount the compressor in the reverse

procedure for removal.

NOTE :

• After replacement of the compressor, be sure

to replace the compressor lead. (Repair part

code of compressor lead: 43160591)
In this time, wrap the ferrite core with the

compressor lead wire by 4 times.

• As shown in the right figure, mount the sound-

insulation plate (inner side, outer side) by

passing through it between the compressor

and the piping, and between the piping and

the partition board.

• Fix TD sensor by the bundling band for heat-

proof on the market via the pipe cover so that

TD sensor does not directly come to contact

with the discharge pipe.

3. Vacuuming

1) Connect the vacuum pump to the charge

port and the check joint of the gas pipe

valve and then drive the vacuum pump.

2) Carry out vacuuming until the vacuum low

pressure gauge indicates 1 (mmHg).

NOTE :

Before vacuuming, open PMV fully.
If PMV is closed, vacuum may be impossible

between liquid pipe valve and PMV of the

outdoor unit.

Forced full-opening method of PMV

• Turn on the leakage breaker.
• Turn on 1 and 3 of Dip switch SW804 on the

control P.C. board of the outdoor unit.

• Keep pushing SW801 on the control P.C. board

of the outdoor unit for 1 second or more.

• After pushing SW801 for 1 second or more,

turn off the leakage breaker within 2 minutes.

4. Refrigerant charge

1) Add the refrigerant amount determined by

the pipe length from the charge port of the

valve.

Remarks

Wrap the ferrite core with
the compressor lead wire for 4 times.

Ferrite core

Ferrite core

Put the end of sound-insulation plate
(outer side) on the other end at
this position.

Compressor lead

Compressor lead

Ferrite core

0 to 2

0 to 2” (0 to 50 mm)

(0 to 50 mm)

(Compressor lead positioning standard)

(Compressor lead positioning standard)

0 to 2” (0 to 50 mm)
(Compressor lead positioning standard)

Compressor lead

Discharge pipe

Discharge pipe

Pass through sound-insulation plate (inner side)
between compressor and discharge pipe,
suction pipe and then put the end of sound-
insulation plate on the other end at this position

Suction pipe

Suction pipe

Pass through sound-

Pass through sound-
insulation plate (outer side)

insulation plate (outer side)
between suction pipe

between suction pipe
and header pipe.

and header pipe.

Pass through sound-
insulation plate (outer side)
between suction pipe
and header pipe.

Discharge pipe

Suction pipe

There should be no clearance between
sound-insulation plate (upper) and
sound-insulation plate (outer side).

Sound-insulation

Sound-insulation
plate (upper)

plate (upper)

Cultural rivet

Cultural rivet

Insert one side

Insert one side
under cultural rivet.

under cultural rivet.

Sound-insulation
plate (upper)

Cultural rivet

Insert one side
under cultural rivet.

Sound-insulation plate

Sound-insulation plate
(outer side)

(outer side)

Sound-insulation plate
(outer side)

SW804

SW804

SW801

SW801

SW804

SW801