Project Name / Date

Division 23 52 33.13 - 5

3.2

START-UP

A. Shall be performed by Raypak factory-trained personnel.

B. Test during operation and adjust if necessary:

1. Safeties (2.2 - F)
2. Operating Controls (2.3)
3. Static and full load gas supply pressure
4. Gas manifold and blower air pressure

C. Submit copy of start-up report to Architect and Engineer.

3.3

TRAINING

A. Provide factory-authorized service representative to train maintenance personnel on procedures

and schedules related to start-up, shut-down, trouble shooting, servicing, and preventive
maintenance.

B. Schedule training at least seven days in advance.

END OF SECTION