Raypak DEL TA LIMITED 899B User Manual
Page 5

Project Name / Date
Division 23 52 33.13 - 5
3.2
START-UP
A. Shall be performed by Raypak factory-trained personnel.
B. Test during operation and adjust if necessary:
1. Safeties (2.2 - F)
2. Operating Controls (2.3)
3. Static and full load gas supply pressure
4. Gas manifold and blower air pressure
C. Submit copy of start-up report to Architect and Engineer.
3.3
TRAINING
A. Provide factory-authorized service representative to train maintenance personnel on procedures
and schedules related to start-up, shut-down, trouble shooting, servicing, and preventive
maintenance.
B. Schedule training at least seven days in advance.
END OF SECTION
See also other documents in the category Raypak Water boiler:
- 240692 (31 pages)
- HIDELTA 992B (68 pages)
- 1000 (74 pages)
- RAYTHERM 962-1826 (2 pages)
- 335 (1 page)
- 504-2004 (4 pages)
- 265 (14 pages)
- 751-1501 (2 pages)
- HI DELTA HD401 (48 pages)
- 2100 - 4001 (2 pages)
- H-0042B (4 pages)
- 2005 (8 pages)
- HI DALTA HD401 (48 pages)
- XFYRE 400 (8 pages)
- 42 & 66 (2 pages)
- 992BE (5 pages)
- 500 (56 pages)
- 182-400 (2 pages)
- Gas Fired Boiler (8 pages)
- MVB 5042004 (56 pages)
- B0147 (43 pages)
- RAYTHERM 0042B (40 pages)
- WH 0090A (28 pages)
- H7 504-2004 (2 pages)
- 503-2003 (60 pages)
- XFYRE NINETY PLUS 850 (8 pages)
- XPAK 85 (68 pages)
- 0066B (38 pages)
- 195A (28 pages)
- Power Vent Raytherm 4001 (2 pages)
- FlexGas (1 page)
- XPAK 120 (12 pages)
- XTHERM 1505 (8 pages)
- RayTherm Commercial Boilers And Water Heater (4 pages)
- 0135B (6 pages)
- RayTemp Hot Water Energy Management Control (30 pages)
- 0090B (39 pages)
- B6000 (51 pages)
- B6000 (2 pages)
- 1001 (76 pages)
- RAYTHERM 133-4001 (44 pages)
- HI DELTA SS HD401 (4 pages)
- XFYRE 300-850 (2 pages)
- 30B (4 pages)