beautypg.com

Wet/dry vac assembly – RIDGID WD1250 User Manual

Page 6

background image

6

1. Line up vacuum port in top assembly

with drain cap located on the front of
the drum.

2. Place lid on top of drum with the drum

latches snug against the drum
channel.

3. Be sure lid completely covers the top

of the drum so leakage does not
occur.

4. Push down on top of the drum latch

areas to cause the flexible locking
tabs to hook onto the drum lip of the
channel.

5. Make sure that the locking tabs are

snapped in place to prevent the lid
from coming off. (See inset).

Your new Wet/Dry Vac is ready for use.

Wet/Dry Vac Assembly

Drum

Out

Flexible

Locking Tab

Drum
Channel

Top
Assembly

Push

Down

Pull Out

Flexible

Locking

Tab

Push

Down

Pull Out

Flexible

Locking

Tab

Cord Storage

Simply, wrap the power cord around the
power head and snap the connector on
the plug to a wrap of the cord.

Insert Hose

Insert the push button end of the “Tug-a-
Long” hose into the inlet of the vac. The
hose should snap into place. To remove
the hose from the vac, press the release
button in the hose assembly and pull the
hose out of the vac inlet, as shown.

Release Button

Pull Handle

Caster

Drain
Cap

Caster Feet
w/Accessory Storage

Drum

Power
Cord

Cord Wrap
Area

Blower
Port

SP6663 12 GALLON.qxd 3/16/07 8:57 AM Page 6