Roberts Gorden CoRayVac CRV-B-9 User Manual
Page 22
CRV-S
ERIES
I
NSTALLATION
, O
PERATION
AND
S
ERVICE
M
ANUAL
16
Step 7.1 Tube Installation
Step 7.2 Coupling and Tube Assembly
Combustion
Chamber
7' 6"
(229 cm)
Combustion
Chamber
NOTE: Tubing requires a downward slope of
1/2" (13 mm) per 20' (6 m) away from
burner. Tailpipe tubing requires a
downward slope of 1" (26 mm) per
20' (6 m) away from burner.
10'
maximum
(3 m)
End View
Weld
Seam
Bottom
of Tube
Hanger
Turnbuckles
Tube
Description
Part Number
Tube
91409XXX
Turnbuckle
91903201
Tube/Reflector Hanger
03090100
Tube
Tube
Orient coupling so that
the impact block is in the
2:00 or 10:00 oclock
positions.
Closed
Open
Tab
3" (8 cm) to
4" (10 cm)
Slide Bar/Coupling Lock
Coupling
Wide End
Coupling
Tube
Slide Bar/Coupling Lock
A
Close coupling with tab.
B
Start slide bar/coupling lock
onto coupling.
C
Insert tubes into coupling.
D
Tighten coupling to join tubes.
Description
Part Number
Coupling
01329600
Slide Bar/Coupling Lock
01329700
Tube
91409XXX