Project Name / Date

Division 23 52 33.13 - 4

PART 3 - EXECUTION

3.1 INSTALLATION

A. Must comply with:

1. Local, state, provincial, and national codes, laws, regulations and ordinances
2. National Fuel Gas Code, ANSI Z223.1/NFPA 54 – latest edition
3. National Electrical Code, ANSI/NFPA 70 – latest edition
4. Canada only: CAN/CSA B149 Installation Code and CSA C22.1 CEC Part I
5. Manufacturer’s installation instructions, including required service clearances and venting

guidelines

B. Manufacturer’s representative to verify proper and complete installation.

3.2 START-UP

A. Shall be performed by Raypak factory-trained personnel.
B. Test during operation and adjust if necessary:

1. Safeties
2. Operating

Controls

3. Static and full load gas supply pressures
4. Gas manifold and blower air pressures

C. Submit copy of start-up report to Architect and Engineer.

3.3 TRAINING

A. Provide

factory-authorized

service representative to train maintenance personnel on procedures

and schedules related to start-up, shut-down, trouble shooting, servicing, and preventive
maintenance.

B. Schedule training at least seven days in advance.

END OF SECTION