beautypg.com

Maintenance, Warning – Ryobi CS30 ZR30000 User Manual

Page 19

background image

Page 19

MAINTENANCE

You can often make adjustments and repairs described
here. For other repairs, have the trimmer serviced by an
authorized service dealer.

SPOOL REPLACEMENT

NEW PREWOUND SPOOL
See Figures 24 and 25.

If replacing string only, refer to “String Replacement” later in
this manual.

Use only

monofilament string. Use original manufacturer's

replacement string for best performance.

String Diameter:

ZR30000 - .080 in. (2.0 mm)

ZR30002 - .095 in. (2.4 mm)

ZR30004 - .095 in. (2.4 mm)

1. Stop the engine, disconnect the spark plug wire. Hold

the string head and unscrew the spool retainer.

To remove the spool retainer:

Turn the spool retainer counterclockwise for models
ZR30000.

Turn the spool retainer clockwise for models ZR30002
and ZR30004.

2. Remove the empty spool from the string head. Keep the

spring attached to the spool.

3. To install the new spool, make sure the two strings are

captured in the slots opposite each other on the new
spool. Make sure the ends of each string is extended
approximately 6 in. (152 mm) beyond each slot.

4. Thread the strings into the eyelets in the string head.

Carefully push the spool into the string head (gently pull
the strings to the outside if necessary). When the spool
is positioned in the string head, grasp the strings and
pull sharply to release them from the slots in the spool.

5. Push down and turn the spool counterclockwise until it

no longer turns. Hold the spool down and rotate clock-
wise a small amount. Release the spool. The spool
should be locked down in the string head. If not, hold
down and rotate until locked.

WARNING:

Use only original manufacturer's replacement parts,
accessories and attachments. Failure to do so can
cause poor performance, possible injury and may void
your warranty.

Fig. 24

SPOOL

RETAINER

Fig. 25

SPRING

SLOTS

STRING HEAD

EYELETS

SHAFT

6. Make sure the string head and the spool retainer are

installed on the drive shaft.

To install the spool retainer:

Turn the spool retainer clockwise for models ZR30000.

Turn the spool retainer counterclockwise for models
ZR30002 and ZR30004.

7. Pull the strings again to rotate the spool into cutting

position. Push the spool retainer down while pulling on
string(s) to manually advance the string and to check for
proper assembly of the string head.