Installation check list – Rheem AP13945-2 User Manual
Page 25
25
A. Water Heater Location
❑
Close to area of vent termination.
❑
Indoors and protected from freezing temperatures .
❑
Proper clearance from combustible surfaces
observed.
❑
Sufficient fresh air supply for proper operation of
water heater.
❑
Air supply free of corrosive elements and
flammable vapors.
❑
Provisions made to protect area from water
damage.
❑
Sufficient room to service heater.
❑
Combustible materials, such as clothing, cleaning
materials, rags, etc. clear of the heater and vent
piping.
❑
Water heater is properly attached to the wall.
B. Water Supply
❑
Water supply has sufficient pressure.
❑
Air purged from water heater and piping.
❑
Water connections tight and free of leaks
❑
Water filter is clean and in place.
❑
Materials used are as instructed in this manual.
❑
Water pipes are insulated and protected from
freezing.
C. Gas Supply
❑
Gas type matches rating plate.
❑
Gas supply pressure is sufficient for the water
heater.
❑
Gas line equipped with shut-off valve, union and
sediment trap.
❑
Approved pipe joint compound used.
❑
Soap and water solution used to check all
connections and fittings for possible gas leak.
❑
Gas Company inspected installation (if required).
D. Relief Valve
❑
Pressure Relief Valve properly installed and
discharge line run to open drain
❑
Discharge line protected from freezing.
E. Venting
❑
Vent pipe material should be category III and meet
UL1738 in US and ULC.636 in Canada.
❑
Vent connector(s) pitched downward to termination
(¼" per foot of length minimum) See page 14.
❑
Vent connector(s) securely fastened together with
high temperature silicone (500°F) (260°C) and air-
tight.
❑
All vent runs are properly supported.
❑
Vent terminal is properly installed.
❑
Sufficient combustion air is available.
❑
Maximum and minimum vent lengths are
observed.
F. Electrical Wiring
❑
Voltage matches rating plate.
❑
Water heater is properly grounded.
❑
Supply cord and/or wiring meets all local codes.
G.
❑
❑
Air Intake Pipe
❑
Connected to the air intake tee/vent termination
and heater.
❑
All vent runs are properly supported.
❑
Maximum and minimum vent lengths are
observed.
❑
Connected securely together and airtight.
Installation Check List