beautypg.com

Raypak XTHERM 1005 User Manual

Page 5

background image

Project Name / Date

4. Canada only: CAN/CGA B149 Installation Code and CSA C22.1 CEC Part I
5. Manufacturer’s installation instructions, including required service clearances and venting

guidelines

B. Manufacturer’s representative to verify proper and complete installation.

3.2 START-UP

A. Shall be performed by Raypak factory-trained personnel.
B. Test during operation and adjust if necessary:

1. Safeties
2. Operating

Controls

3. Static and full load gas supply pressure
4. Gas manifold and blower air pressure
5. Amp draw of blower
6. Combustion

analysis

C. Submit copy of start-up report to Architect and Engineer.

3.3 TRAINING

A. Provide

factory-authorized

service representative to train maintenance personnel on procedures

and schedules related to start-up, shut-down, troubleshooting, servicing, and preventive
maintenance.

B. Schedule training at least seven days in advance.

END OF SECTION