beautypg.com

NEC 1160Xd User Manual

Page 14

background image

10 Express5800/1160Xd/1320Xd Installation Procedures

18. Once the server is located in its designated position, using an adjustable

wrench, lower the leveling pads to secure the server in place.
See Figure 9A.

A

A

Leveling Pad

Figure 9. Lowering the Leveling Pads

20. At the front of the system. Remove the single screw securing the front

stabilizer and pull the stabilizer out from the cabinet as shown in Figure 10.

Figure 10. Releasing the Front Stabilizer

This manual is related to the following products: