Installation, For new construction, For existing construction – NuTone VX550 User Manual
Page 27
27
Installation
Each NuTone Central Cleaning System comes packed with
a Planning & Installing Guide. Whatever your home layout –
multi-level, two-story or ranch – we have a system to meet
your needs. As few as three or four inlets can take care of an
average size home. Once you’ve determined the right system
for you, a typical system can be installed in a day or less.
Just choose whether you want to do-it-yourself or hire a
professional installer.
For New Construction
Installation is simple! Plan the location of the power unit
and inlets with your building or contractor. Tubing, inlets and
electrical hook-up can be made before drywall, plaster or
finished flooring is in place. You can even “pre-tube” your home,
then select and install the power unit later!
For Existing Construction
Just determine the number and location of inlets and cutting
through drywall can be kept to a minimum. Tubing can be run
through cold air returns, closets and stairwells.
NOTE: NuTone Central Cleaning Systems are not designed
for wet pick-up.